beautypg.com

Checklist: router gateway stand alone stage – Grass Valley NewsBrowse Desktop Browsing System Installation v.2.7 User Manual

Page 75

background image

December 16, 2004

NewsBrowse Installation and Configuration Guide

75

Router Gateway stand-alone stage

2. From the Router Gateway host, click

Start | Programs | Thomson | NewsBrowse |

Diagnostic Tools | Router Gateway Client

. The Router Gateway Client application

opens.

3. Configure as follows:

• IP:

localhost

• Port:

8065

.

4. Click

Connect

. Verify that the Destinations and Sources drop-down lists are

populated, which means the connection is successful.

5. Configure as follows to trigger the router controller:

• Destinations: Select a destination from the list that is not the destination

currently used by the router.

• Sources: Select a source from the list that is not the source currently used by the

router

6. Monitor the video and audio currently routed. Click

Take

. Verify that the video and

audio changes.

7. Repeat previous steps to validate that takes work for all destinations that are

configured to an ingest channel.

Checklist: Router Gateway stand alone stage

Use the following check list to verify that the basic configuration and testing of the
Router Gateway stand alone stage is complete.

" The machine hosting the Router Gateway software component connects to the

router controller.

" The Router Gateway software component can change Destinations and Sources on

the router controller.