7

Checklist before installation

Table 6 Checklist before installation

Item Requirements

Result

Installation site

Ventilation

There is a minimum clearance of 10 cm (3.9 in)

around the inlet and exhaust vents for heat dissipation
of the router chassis.

A ventilation system is available at the installation site.

Temperature

0°C to 45°C (32°F to 113°F).

Relative humidity

10% to 95% (noncondensing).

Cleanness

Dust concentration ≤ 3 × 104 particles/m

3

.

No dust on desk within three days.

ESD prevention

The equipment and floor are well grounded.

The equipment room is dust-proof.

The humidity and temperature are in the acceptable

range.

Wear an ESD wrist strap and uniform when touching a

circuit board.

Place the removed memory module, CF card, or

HIM/MIM on an antistatic workbench, with the face
upward, or put it into an antistatic bag.

Touch only the edges, instead of electronic

components when observing or moving a removed
memory module, CF card, or HIM/MIM.

EMI prevention

Take effective measures to protect the power system

from the power grid system.

Separate the protection ground of the router from the

grounding device or lightning protection grounding

device as far as possible.

Keep the router far away from radio stations, radar

and high-frequency devices operating in high current.

Use electromagnetic shielding when necessary.

Lightning
protection

The grounding cable of the chassis is well grounded.

The grounding terminal of the AC power receptacle is

well grounded.

A port lightning arrester is installed. (Optional)

A power lightning arrester is installed. (Optional)

A signal lightning arrester is installed at the input end

of an external signal cable. (Optional)

Electricity safety

Equip an uninterrupted power supply (UPS).

In case of emergency during operation, switch off the

external power switch.