Checklist before installation – H3C Technologies H3C SR6600 User Manual
Page 17
7
Checklist before installation
Table 6 Checklist before installation
Item Requirements
Result
Installation site
Ventilation
•
There is a minimum clearance of 10 cm (3.9 in)
around the inlet and exhaust vents for heat dissipation
of the router chassis.
•
A ventilation system is available at the installation site.
Temperature
0°C to 45°C (32°F to 113°F).
Relative humidity
10% to 95% (noncondensing).
Cleanness
•
Dust concentration ≤ 3 × 104 particles/m
3
.
•
No dust on desk within three days.
ESD prevention
•
The equipment and floor are well grounded.
•
The equipment room is dust-proof.
•
The humidity and temperature are in the acceptable
range.
•
Wear an ESD wrist strap and uniform when touching a
circuit board.
•
Place the removed memory module, CF card, or
HIM/MIM on an antistatic workbench, with the face
upward, or put it into an antistatic bag.
•
Touch only the edges, instead of electronic
components when observing or moving a removed
memory module, CF card, or HIM/MIM.
EMI prevention
•
Take effective measures to protect the power system
from the power grid system.
•
Separate the protection ground of the router from the
grounding device or lightning protection grounding
device as far as possible.
•
Keep the router far away from radio stations, radar
and high-frequency devices operating in high current.
•
Use electromagnetic shielding when necessary.
Lightning
protection
•
The grounding cable of the chassis is well grounded.
•
The grounding terminal of the AC power receptacle is
well grounded.
•
A port lightning arrester is installed. (Optional)
•
A power lightning arrester is installed. (Optional)
•
A signal lightning arrester is installed at the input end
of an external signal cable. (Optional)
Electricity safety
•
Equip an uninterrupted power supply (UPS).
•
In case of emergency during operation, switch off the
external power switch.