beautypg.com

REMKO Multi-talent User Manual

Page 65

background image

Please also note the connection diagrams or the electrical circuit diagrams for the installed heat pump.
These are found in the respective installation manual.

NOTE

Terminal

Sensor no.

Description

Note

1

F9

External sensor

2

F8

Collector sensor (collective supply)

Heating control sensor

Heating control sensor. Must be located in accordance with the

system diagram!

3

F6

Hot water sensor

4

F5

Supply sensor HC 2 (mixer circuit)

5

F3

FBR-2

Analog remote control (only for HK1)

6

F2

FBR-2

Analog remote control (only for HK1)

7

F1

Sensor storage tank bottom

Reference sensor solid-fuel boiler

8

F11

Supply sensor WP or HC 1

HC 1 is a direct heating circuit

9

F12

Sensor storage tank bottom

Reference sensor solar or solid-fuel boiler

10

F13

not assigned

11

F14

Sensor solar collector or solid-fuel boiler

Pt 1000

12

F15

Flow meter

Impulse input

13

F17

Return sensor (cooling control sensor)

14

eBUS +

Signal output 0-10 V

Modulation depth (target output in %)

15

eBus -

Signal output 0-10 V

Modulation depth (target output in %)

16

CAN-Bus H

Data bus for connecting to other heat pumps managers and / or

digital remote controls

17

CAN-Bus L

18

CAN-Bus -

19

CAN-Bus +

Remko specific contact layout for the circuit board inputs

Setting of the DIP switches

(ADR)

DIP switches 1-4:

The DIP switches 1-4 serve for

the setting of the controller

address. Normally the standard

address is set to 01. On the

other hand, if multiple controllers

(heat pump manager) are in the

system (switched in combination

through the CAN-BUS loop),

each individual controller must

be issued a separate controller

address. The address must then

be adopted in the corresponding

display/control element (BM-T

"Terminal"). It is possible to assign

a maximum 16 different addresses

- in other words the use of up to

16 controllers. The assignment

of the DIP switch position for the

controller address can be found

directly in the "Solder side view"

connection diagram.

DIP switch 5:

Not assigned

DIP switch 6:

DIP switch 6 serves as a BUS load

resistor. The BUS load resistor must

be set once in the bus system.

DIP switch 6 --> OFF: The load

resistor is not set.

DIP switch 6 --> ON: The load

resistor is set.


LED displays

Green LED blinking: no BUS

connection

Green LED continuous: BUS-connection

present

Red LED blinking: Error

RESET to factory setting

The heat pump manager can be
reset to the factory setting.
For this purpose, proceed as fol-
lows:
1. Voltage OFF
2. Block DIP switch 1
3. Voltage ON
4. Reset DIP Switch 1
Note: Step 4 must take place
within 3 seconds of Step 3. The
loading of the factory setting was
successful if the LEDs flicker for 1
second during Step 4.

65