beautypg.com

Remko heat pump manager – REMKO Multi-talent User Manual

Page 30

background image

REMKO HEAT PUMP MANAGER

Heat generator

Designation

Value range

Factory setting

Description

Max T-collector

30.0°C-110.0°C

70.0°C

Setting the maximum collector temperature [sensor 8] (col-
lective supply temperature).

Min T-collector

0.0°C-80.0°C

0.0°C

Setting the minimum collector temperature [sensor 8] (col-
lective supply temperature).

Min T-WE 2

0.0°C-80.0°C

0.0°C

Setting the desired minimum temperature for the heat gen-
erator 2 (WE 2).

Reduces condensate formation in the heat generator if
demand for heat is low. Shut-off of the heat generator
takes place in all cases at the earliest when the minimum
temperature+hysteresis set here is reached.

Hysteresis

2.0K-20.0K

2.0K

Function optimisation of the heat generator operation at
variously heavy demands on the heating appliance.

The effective switching hysteresis is reduced linearly from
the set hysteresis to the minimum hysteresis in the hysteresis
period following switching on of the burner (= 2.0K).

At low heat transfers the higher hysteresis setting is effective
(short runtimes and frequent synchronising of the burner are
prevented).

For longer burner operation (high heating loads) the hyster-
esis is automatically reduced to 5K (Preheating the heating
appliance to unnecessarily high temperatures is avoided).

Hysteresis period

00 Min.-30 Min.

00 Min.

Setting the hysteresis period.

Sequence change

00 h-800 h

00 h

Setting the desired operating hours for the first heat gen-
erator in the active sequence, but the active sequence with
which the heat generator-sequence should switch (time until
the sequence change).

When operating with at least 2 heat generator, there is the
possibility to switch the heat generator-sequence in accord-
ance with the operating hours set here.

There is no switch at "00 h".

Clock inhibition

00 Min.-120 Min.

00 Min.

Setting the minimum wait time following switching on of
the heat generator or for a switching heat generator, also for
switching off of a stage until switching on of the next stage
(Idle time for the next stage).

At "00 min" the clock inhibition is 10 sec.

Level 4 - SPECIALIST - Description of parameters and settings - continued

30