beautypg.com

Dataman 40Pro User Manual

Page 148

background image

148

The Job Report is generated for recently loaded project file, only when statistics value of
Total is greater than 0.
It means, at least one device operation (program, verify,...) must be performed.

Job Report dialog settings are in dialog PG4UWMC Settings (menu Options | Settings) in tab
Job Report.
Following options are available for Job Report:

When the checkbox Automatically save Job Report file is checked, the Job Report will be
saved automatically to directory specified in edit field Job Report directory and with file name
created as following:

job_report__.jrp

where
is decimal order of the file. If there exist any report files with the same name, then
order for new report file is incremented about order of existing files.
is project file name of recently used project, and without the project file name
extension.

Example 1: Let's use the project file c:\myproject.eprj and directory for Job Report set to
d:\job_reports\
There are no report files present in the Job Report directory.
The final Job Report file name will be:
d:\job_reports\job_report_000_myproject.jrp

Example 2: Let's use the conditions from Example 1, but assume there is already one report
file present.
Name of this file is d:\job_reports\job_report_000_myproject.jrp
The final Job Report file name of new report will be:
d:\job_reports\job_report_001_myproject.jrp

Note, the order inside file name is incremented by 1.

This manual is related to the following products: