Job report – Dataman 40Pro User Manual
Page 130
130
Job Report
Job Report represents the summary description of operation recently made on device. Job is
associated with project file and it means the operation starting with Load project until loading
of new project or closing program PG4UW.
Job Report contains following information:
project name
project date
Protected mode status
PG4UW software version
programmer type and serial number
start time of executing the Job (it means time when Load project operation was
performed)
end time of executing the Job (time of creating the Job Report)
device name
device type
checksum
device operation options
serialization information
statistics information
Job Report is generated in following cases:
user command Load project is selected
closing or disconnecting programmer sites is selected
closing the PG4UW
device Count down counter reaches 0 (finished status)
manually by user, when menu "File | Job Report" is used
The Job Report is generated for recently loaded project file, only when statistics value of
Total is greater than 0.
It means, at least one device operation (program, verify,...) must be performed.
Following options are available for Job Report:
Checkbox Enable Job Report function - when checked, the Job Report function is active
(enabled). Otherwise the Job Report function is disabled.
Checkbox Automatically save Job Report file - when checked, the Job Report will be saved
automatically to directory specified in edit field Job Report directory and with file name
created as following:
job_report_
where
order for new report file is incremented about order of existing files.
extension.