Installation / performance check list – Reznor R8HE Unit Installation Manual User Manual
Page 52
Specifications & illustrations subject to change
without notice or incurring obligations (07/14).
709726A (Replaces 7097260)
INSTALLATION / PERFORMANCE CHECK LIST
GAS SYSTEM
Gas Type: (circle one)
Natural
Gas
Propane
Gas pipe connections leak-tested?
YES
NO
Gas Line Pressure: .......................................................... (in - W.C.)
Is there adequate fresh air supply for
combustion and ventilation?
YES
NO
Installation Altitude: ............................................................(FT.)
Deration Percentage: .........................................................(%)
Heating Input: ....................................................................(Btuh)
Supply Air Temperature: ....................................................(° F)
Return Air Temperature: ....................................................(° F)
Temperature Rise: .............................................................(° F)
During Unit Operation:
High Fire Manifold pressure: ............................................ (in - W.C.)
Low Fire Manifold pressure:............................................. (in - W.C.)
REFRIGERATION SYSTEM
Was unit given 24 hr warm up period
for crankcase heaters (if equipped)?
YES
NO
Stage-1 Liquid Pressure (high side)
Stage-1 Suction Pressure (low side)
INSTALLATION ADDRESS:
CITY:
STATE:
UNIT MODEL #
UNIT SERIAL #
Unit Installed Minimum clearances per
YES
NO
INSTALLER NAME:
CITY:
STATE:
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
ELECTRICAL SYSTEM
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
YES
NO
SINGLE PHASE UNITS
Rated Voltage: ................................................................. VOLTS
L1-L2 Volts: ...................................................................... VOLTS
3–PHASE UNITS
Rated Voltage: ................................................................. VOLTS
L1-L2 Volts: ...................................................................... VOLTS
L1-L3 Volts: ...................................................................... VOLTS
L2-L3 Volts: ...................................................................... VOLTS
Avg. Volts: ........................................................................ VOLTS
Max. deviation of voltage from avg. volts: ........................ VOLTS
% Volt Imbalance: ............................................................ VOLTS
VENTING SYSTEM
Is the heat exchanger condensate
drain and vent pipe installed?
YES
NO
Is pipe free of restrictions?
YES
NO
Filter(s) secured in place?
YES
NO
Filter(s) clean?
YES
NO
ATTENTION INSTALLERS:
It is your responsibility to know this product better than your customer.
This includes being able to install the product according to strict safety
guidelines and instructing the customer on how to operate and maintain
the equipment for the life of the product. Safety should always be the
deciding factor when installing this product and using common sense
plays an important role as well. Pay attention to all safety warnings and
any other special notes highlighted in the manual. Improper installation of
the unit or failure to follow safety warnings could result in serious injury,
death, or property damage. These instructions are primarily intended
to assist qualified individuals experienced in the proper installation of
this appliance. Some local codes require licensed installation/service
personnel for this type of equipment.
Single Phase Models Only