beautypg.com

Installation / performance check list – Reznor R8HE Unit Installation Manual User Manual

Page 52

background image

Specifications & illustrations subject to change
without notice or incurring obligations (07/14).

709726A (Replaces 7097260)

INSTALLATION / PERFORMANCE CHECK LIST

GAS SYSTEM

Gas Type: (circle one)

Natural

Gas

Propane

Gas pipe connections leak-tested?

YES

NO

Gas Line Pressure: .......................................................... (in - W.C.)
Is there adequate fresh air supply for

combustion and ventilation?

YES

NO

Installation Altitude: ............................................................(FT.)

Deration Percentage: .........................................................(%)

Heating Input: ....................................................................(Btuh)

Supply Air Temperature: ....................................................(° F)

Return Air Temperature: ....................................................(° F)

Temperature Rise: .............................................................(° F)

During Unit Operation:

High Fire Manifold pressure: ............................................ (in - W.C.)

Low Fire Manifold pressure:............................................. (in - W.C.)

REFRIGERATION SYSTEM

Was unit given 24 hr warm up period

for crankcase heaters (if equipped)?

YES

NO

Stage-1 Liquid Pressure (high side)

Stage-1 Suction Pressure (low side)

INSTALLATION ADDRESS:

CITY:

STATE:

UNIT MODEL #

UNIT SERIAL #

Unit Installed Minimum clearances per

Figure 1 (page 5)

?

YES

NO

INSTALLER NAME:

CITY:

STATE:

Has the owner’s information been

reviewed with the customer?

YES

NO

Has the Literature Package been left

with the unit?

YES

NO

ELECTRICAL SYSTEM

Electrical connections tight?

YES

NO

Line voltage polarity correct?

YES

NO

Has the thermostat been calibrated?

YES

NO

Is the thermostat level?

YES

NO

Is the heat anticipator setting correct?

YES

NO

SINGLE PHASE UNITS

Rated Voltage: ................................................................. VOLTS

L1-L2 Volts: ...................................................................... VOLTS

3–PHASE UNITS

Rated Voltage: ................................................................. VOLTS

L1-L2 Volts: ...................................................................... VOLTS

L1-L3 Volts: ...................................................................... VOLTS

L2-L3 Volts: ...................................................................... VOLTS

Avg. Volts: ........................................................................ VOLTS

Max. deviation of voltage from avg. volts: ........................ VOLTS

% Volt Imbalance: ............................................................ VOLTS

VENTING SYSTEM

Is the heat exchanger condensate

drain and vent pipe installed?

YES

NO

Is pipe free of restrictions?

YES

NO

Filter(s) secured in place?

YES

NO

Filter(s) clean?

YES

NO

ATTENTION INSTALLERS:

It is your responsibility to know this product better than your customer.

This includes being able to install the product according to strict safety

guidelines and instructing the customer on how to operate and maintain

the equipment for the life of the product. Safety should always be the

deciding factor when installing this product and using common sense

plays an important role as well. Pay attention to all safety warnings and

any other special notes highlighted in the manual. Improper installation of

the unit or failure to follow safety warnings could result in serious injury,

death, or property damage. These instructions are primarily intended

to assist qualified individuals experienced in the proper installation of

this appliance. Some local codes require licensed installation/service

personnel for this type of equipment.

Single Phase Models Only