6.3 Unit Inlet Air

(cont'd)

6.0 Mechanical

(cont'd)

FIGURE 15 - Connect Fresh Water

Supply to Inlet of Float Valve

Simulates

Side Panel

Use 1/4" Tubing

for Fresh Water

Supply

Compression Nut

and Tubing Ferrule

(Inside

Cabinet)

Float

Valve Rod

Instructions for Installing Optional Fill &

Drain Kit

NOTE: Follow instructions included in the valve

packages for attaching valves to the water line only.

The remainder of the installation instructions with the

valves does not apply to this type of application.

Water Line Connections (See illustration):

Supply (3-Way Valve) Connections - Connect the

water supply line to "B" (normally closed). Connect

the water drain line to "A" (normally open). Connect

the middle outlet to supply the water to the reservoir.

Drain (2-Way Valve) Connections - Connect the drain

pipe from the reservoir to the valve inlet. Connect the

outlet side into the drain lines from the cooling reser-

voir and the supply valve.

Electrical Connections (requires black and white

14-gauge wire) Refer to Wiring Diagram provided

with the furnace:

WARNING: Risk of electrical shock. Disconnect

the power.

1. Refer to the wiring diagram for terminal

connections. (

NOTE: If kit is not ordered with

the system, connections will not be shown on

Evaporative

Cooling

Module

Float valve inlet water

connection (1/4” compression)

or inlet water connection to

solenoid valve for metering

system (1/2” male fitting)

Overflow

fitting -

3/4” garden

hose thread

tapped with

1/2” female

NPT

Drain fitting - 3/4”

garden hose thread

tapped with

1/2” female NPT

2-way

solenoid valve

(normally open)

3-way

solenoid

valve

To drain

Pressure regulator

(10 psi max)

Service valve

Roof Line

= Field supplied

Field supplied and

installed water piping

A (N.O.)

B (N.C.)

Water

inlet

FIGURE 16 - Water Connections including Optional

Drain and Fill Kit (pump & float controls)

the diagram. Terminal connections are specific to each system. Contact the factory for terminal connections. Be

prepared to provide all model information.)

2. Run field-supplied black wire from the electrical compartment (terminal on the wiring diagram) of the evaporative

cooling module and connect to the black wire on both the 3-way and the 2-way valve.

3. Run field-supplied white wire from the electrical compartment (terminal on the wiring diagram) of the evaporative

cooling module and connect to the white wire on both the 3-way and the 2-way valve.

mostat is satisfied. See

FIGURE 16. If

installing an optional fill and drain kit,

follow the instructions with

FIGURE 16.

Consult wiring diagram for electrical

connections.

6.3.4 Evaporative

Cooling Module,

(cont'd)

AquaSaver Timed Metering Control System

If the cooling module is equipped with an optional timed metering system, connect a

1/2" water line to the fitting on the side of the cooling module. Due to various water

pressures and installation conditions, the water supply line may bang abruptly when

the solenoid valve in the AquaSaver system closes. This banging can be minimized

by installing an optional water hammer arrestor in the supply line. When installing an

optional water hammer arrestor, select an indoor (above 32°F) location, either horizon-

tal or vertical, in line with and as close to the solenoid valve as possible. Follow the

manufacturer's instructions to install and maintain the water hammer arrestor.
A freeze protection kit (Option CT5) is also available.

CAUTION: Water reservoir must be drained and pump motor turned off when outside temperature

falls below 32°F (0°C). Pump must never be operated without water in the reservoir. See Hazard

Levels, page 2.