General installation – Oldcastle BuildingEnvelope CW-250 User Manual
Page 7
7
February 2012
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com
GENERAL INSTALLATION
NOTE:
1) CLEAN FACE OF MULLION AND
HORIZONTALS WITH ISOPROPYL
ALCOHOL PRIOR TO INSTALLATION
OF GLAZING GASKETS TO REMOVE
ALL DIRT AND CUTTING OILS.
2) PROTECTIVE LINER TO BE LEFT
ON GLAZING GASKETS UNTIL GLASS
IS INSTALLED.
3) IT IS RECOMMENDED THAT THE INTERIOR
GLAZING GASKET BE PLACED
JUST PRIOR TO INSTALLATION OF THE GLASS,
SINCE LINER WILL ADHERE TO GASKET IF
ALLOWED TO DRY AFTER BECOMING WET.
4) IF DIRTY OR DUSTY FACE OF GASKET
SHOULD BE CLEANED WITH 50/50 SOLUTION
OF ISOPROPYL ALCHOHOL AND WATER
PRIOR TO GLAZING.
5) PROPER SEALING OF GASKET CORNERS
IS CRITICAL TO SYSTEM PERFORMANCE.
THIS PROCEDURE SHOULD BE PERFORMED
AT THE TIME OF INSTALLATION OF GLASS.
SEE DETAILS BELOW.
DETAIL SHOWN BELOW
PUSH VERTICAL
GASKET INTO PLACE
APPLY SEALANT TO END OF VERTICAL
CUT OFF GASKET
APPROX. 1/4” OVERLAP
TRIM SIDE OF
HORIZONTAL GASKET FLUSH
WITH VERTICAL GASKET
NOTE: DO NOT ENTIRELY REMOVE PROTECTIVE
LINER UNTIL READY TO GLAZE.
CW250-FP-5
GASKET APPLICATOR
C W - 2 5 0 C U R T A I N W A L L I N S T A L L A T I O N M A N U A L