Installation Procedure

13

The six position pluggable screw terminal labeled J3 Panic/LON is provided as the

termination point for both Emergency and SmartLink control.

Connect Emergency

Step 1:

Strip 6.35mm (1/4”) of insulation from the ends of the two 1.5mm

2

wires.

Step 2:

Remove the 6 position pluggable connector from J3 on the I/O PCB.

Step 3:

Twist the two 1.5mm

2

wires together as close to the connector as possible.

Step 4:

Insert the 1.5mm

2

into pins 5 and 6.

Step 5:

Tighten the screw firmly onto each wire.

Connect SmartLink

Termination is available for up to two separate SmartLink data runs and is FTT-10A

topology-free and polarity independent utilizing a LonWorks

®

network. For systems utilizing

SmartLink wall stations, ETC recommends terminating the station data run to the

SmartPack with the LinkPower supply installed and utilizing the second data bus for

SmartLink pack to pack synchronization. A clean, well organized wire installation assists

with troubleshooting efforts when needed.

Step 1:

Cut the Belden 8471 cable so that a 20cm (8”) tail extends from the edge of the

panel.

Step 2:

Strip 18cm (7”) of the outer jacket off.

Step 3:

If pulling two Belden 8471 cables, label each pair with data type and run

designation. Example: SL1 and SL2.

Step 4:

Strip 6.35mm (1/4”) of insulation from the ends of the Belden 8471 wires.

Step 5:

Insert the white wire from SL1 data run into pin 1 (NETB) terminal on the

pluggable connector. Tighten the screw firmly onto the wire.

Step 6:

Insert the associated SL1 black wire into pin 2 (NETA) terminal on the pluggable

connector. Tighten the screw firmly onto the wire.

Step 7:

Repeat steps 5-6 to terminate the second data run (SL2) if required to the

remaining pins 3 and 4 terminals on the connector. Tighten the screw firmly onto

each wire.

Step 8:

Reinstall the 6 position pluggable connector to J3 on the I/O PCB.

N o t e :

One SmartLink host product (SmartPack, SmartSwitch, Unison DRd with

SmartLink or Sensor + with SmartLink) in the system must have a LinkPower

Supply or Station Power Module installed for wall station power. A SmartLink

LinkPower supply (7021K1010) is limited to powering four SmartLink stations.

Alternatively, you may power up to 16 SmartLink stations when using a SmartLink

Station Power Module (S-SPM). You may have up to four SmartLink host products

in a SmartLink system.

NETB

NET

A

NETB

NET

A

COM

PA

N

1 2 3 4 5 6

COM

Emergency

NET

A

NET

B

NET

B

NET

A

LON1

LON2

DMX

NC

J2
Control

1 2 3 4