FUJITSU CentricStor V3.1D User Manual
Page 292
292
U41117-J-Z125-7-76
History data
Global Status
Otherwise the status of the reorganization of the physical volume group(s) is displayed:
Meaning of the entries:
no.
Line number
LV
Name of the logical volume
state
Status of the reorganization:
done
Completed
failed
Aborted; can only occur with runs started manually
initiated
Job sent to VLM
restoring
Being moved back to the cache
restore done Moved back to the cache; rewriting has not yet started
saving
Being written to tape
start
Not yet started
retry
Number of command retries; after more than 2 the job is aborted.
timestamp
Time at which the current status was entered.
The number specified in the retry column also relates to command retries at the PLM-VLM
interface. If the high load on the VLM means that a PLM request could not be satisfied within
this time limit, the job is issued again.
Retries are alarming only if a particular PV is repeatedly connected with a large number of
retries. In this case the logical volumes on the PV must be moved and the PV must be
removed (see the
section “Physical Volume Operations » Erase Physical Volumes” on