American Power Conversion 250 A User Manual
Page 95

InfraStruXure Power Generation System
85
Selector switch, on motorized
switch
,
Service, obtaining
. See back cover
Single-pole label
,
SNMP interface
,
SNMP, for accessing the ATS
,
Source 1 control transformer,
location of
,
13
Source 1 current transformer,
location of
,
Source 1 fuse block, location of
,
13
Source 1 input switch, location
of
,
14
Source 1 lamp, location of
,
Source 1 motorized switch, location
of
,
Source 2
if it is a utility mains
connection
,
if it is not an APC ISX
generator
,
Source 2 control transformer,
location of
,
Source 2 fuse block, location of
,
Source 2 input switch, location
of
,
13
Source 2 lamp, location of
,
12
Source 2 motorized switch, location
of
,
12
Source label
,
Specifications
,
SSH, for accessing the control
console
,
Stats screen
,
Sub-feed breakers, location of
,
12
System ID menu
,
System load test
,
T
TCP/IP configuration methods
,
Telnet, for accessing the control
console
,
Temperature, for operation
,
Test log, how to view
,
Testing
configuring duration of
,
how a test occurs
,
how to initiate or view a test
,
of the EPO switch
,
schedule
,
3
,
Testing screen
,
–
Three-pole breaker label
,
Tools, for circuit breaker
installation
,
Total power off
,
–
Transfer blocking, configuring
conditions for
,
Transfer setup
,
8
Transfers, open and closed
,
Trip test button
,
Tripped LED
,
U
Updates, to this manual
,
User connection plate
connecting the EPO switch
,
detailed description
,
location of
,
User contacts port, location of
,
Utility power, condition of
,
W
Warnings
,
–
for emergency manual
operation
,
for Emergency Power Off
,
for installation
,
for motorized switches
,
Web interface
,
Wheel extensions, on the panel
board
,
Wire size, how to determine
,
Wiring specifications
,
Withdrawal prevention lock
,