Parts and tools needed for installation procedures – American Power Conversion 250 A User Manual
Page 83

How to Add Sub-Feed Output Distribution Circuit Breakers to the ATS
InfraStruXure Power Generation System
73
Parts and tools needed for installation procedures
All assembly parts needed for installation procedures are included with the circuit breaker kits.
T1 single-pole breaker assembly
T1 single-pole
T1 single-pole breakers
M3×75 screws, washers and retainers
Breaker brackets
M6×12 Torx screws
M4×15 screws and washers
T1 three-pole
T1 three-pole breakers
M4×70 screws and washers
Breaker brackets
M6 x 12 Torx screws
M4×70 screws and washers
Tools required
Phillips screwdriver
T25 Torx driver
Allen wrench
T1 three-pole breaker assembly
adapter module
T3 three-pole
T3 three-pole breakers
M4×70 screws and washers
Breaker brackets
M6 x 12 Torx screws
M4×70 screws and washers
T3 three-pole breaker assembly
adapter module
adapter module
- 5000VA (25 pages)
- MX28B-400 (46 pages)
- CTEG4-240MB-5 (7 pages)
- 200/208 V (52 pages)
- VS 100 (54 pages)
- SMARTUPS 700 (60 pages)
- AP7562J (24 pages)
- 100VAC (18 pages)
- Smart-UPS VT (56 pages)
- 1400XLT (30 pages)
- 350/550 (2 pages)
- SURTA1500XLJ (16 pages)
- RT-UXI (20 pages)
- 2200 VA (17 pages)
- 208 Vac (17 pages)
- 1500VA (18 pages)
- Smart-UPS (36 pages)
- 60-80kW 208/480V (34 pages)
- 420 (3 pages)
- 220 VAC (21 pages)
- 350 (2 pages)
- AP9215 (20 pages)
- Back-UPS CS 500 (2 pages)
- PDU (54 pages)
- Airless Paint Sprayer 68001 (24 pages)
- AP7610 (16 pages)
- AP7902 AP7911 (26 pages)
- UPS (2 pages)
- RT XLI/XLICH (34 pages)
- 990-2233A (19 pages)
- 208/220 (48 pages)
- NS 600 (2 pages)
- SYMF800KH (54 pages)
- 20-30 kVA 480V (4 pages)
- 100 VAC (25 pages)
- 750 (17 pages)
- 3000 (23 pages)
- MX28B200 (61 pages)
- RS 1000 (2 pages)
- 200-240 VAC (21 pages)
- 5000RMB (23 pages)
- 480kW400V (32 pages)
- AP9825I (1 page)
- 250/450 (2 pages)
- SUA48RMXLBP3U (8 pages)