HP XP P9500 Storage User Manual
Page 44
![background image](/manuals/397725/44/background.png)
•
Before a fiber channel initiator port can be changed to target or RCU target, the following
must be performed:
◦
All affected data volume pairs must be released.
◦
All logical paths must be deleted from the initiator port to the remote storage system.
◦
After logical paths are deleted, cables connecting the local system to the remote system
must be removed.
•
The number of hosts connected to a target port must be limited to 128 or fewer to avoid illegal
disconnection.
See the section on planning ports in the
“Planning ports for data transfer ” (page 39)
for information
on target, initiator, and RCU target ports and to determine the number of initiator and RCU target
ports required by your system.
To define port attributes
1.
In Remote Web Console, select Actions > Remote Copy > Continuous Access Journal > DKC
Operation.
2.
Click
to change the mode from View to Modify.
3.
In the Display box, select Port. The ports associated with the local storage system are listed.
4.
Right-click the port that you want to change and select the desired port type, Initiator, RCU
Target, or Target).
5.
Select all the port attributes that you want to change, review the Preview list.
CAUTION:
Read and follow the important caution before applying the port attribute changes.
•
To change the setting, right-click the port in the upper right list and select the attribute.
•
To release the setting, right-click the item in the Preview list and select Delete.
6.
Click Apply to apply the settings. If an error occurs, the error code appears in the rightmost
column of the Preview list. To view detailed information about the error, right click the error
code and select Error Detail.
44
Configuration operations