beautypg.com

Start-up, 1 switching on the power, 2 starting the signal converter – KROHNE IFC 050 Converter EN User Manual

Page 43

background image

START-UP

5

43

IFC 050

www.krohne.com

08/2013 - 4002184002 - MA IFC 050 R02 en

5.1 Switching on the power

Before connecting to power, please check that the system has been correctly installed.
This includes:

• The device must be mechanically safe and mounted in compliance with the regulations.
• Remove the bar magnet and keep it on a save place (is only valid for the display version).
• The power connections must have been made in compliance with the regulations.
• The electrical terminal compartments must be secured and the covers have been screwed

on.

• Check that the electrical operating data of the power supply are correct.

• Switching on the power.

5.2 Starting the signal converter

The measuring device, consisting of the measuring sensor and the signal converter, is supplied
ready for operation. All operating data have been set at the factory in accordance with your order
specifications.

When the power is switched on, a self test is carried out. After that the device immediately
begins measuring, and the current values are displayed.

It is possible to change between the two measured value windows, the trend display and the list
with the status messages by pressing the keys ↑ and ↓. For possible status messages, their
meaning and cause refer to

Status messages and diagnostic information

on page 64.

Figure 5-1: Displays in measuring mode (examples for 2 or 3 measured values)
x, y and z denote the units of the measured values displayed