beautypg.com

Installation for flow measurement, 2 2 traverses with 2 rails – KROHNE OPTISONIC 6300 P-6400 EN User Manual

Page 27

background image

INSTALLATION FOR FLOW MEASUREMENT

3

27

OPTISONIC 6300 P

www.krohne.com

03/2013 - 4000972603 - MA OPTISONIC 6300 P R03 en

3.4.2 2 traverses with 2 rails

Applicable diameters with two rails:

• Mount the first rail on the pipe. Make sure that you mount the rail in line with the pipe!
• Position the left transducer in any position X (see next section).
• Mount the second rail (align it with the first rail) at a distance 2 to arrange that the transducer

in the second rail is within the range it can be moved.

• The advised distance 1 is defined from the center

center

center

center of the left transducer to the left

left

left

left side of the

right transducer. Put the second transducer at position Z = advised distance 1 + X - distance
2 - 415 mm / 16.3".

Number of
traverses

Diameter range

2

DN200...750

INFORMATION!
The two rails must be installed in a straight line.

Figure 3-12: Mounting 2 rails in V-mode (2 traverses)

1 Advised distance
2 Distance between 2 rails