Yokogawa IR400 User Manual
Page 110

9 - 15
IM 11G02N01-01E
NO
2
/NO Converter
Part number: K9350LE (Non-CE conformity)
K9350LF (CE conformity)
Mounting: Indoor surface mounting
Target Gases: General boiler exhaust gas,
atmosphere
Catalyst: Amount; 2 cm
3
Replacement cycle; Approx. 12 months
(at flow rate of 0.3 L/min with 5% O
2
,
10 ppm NO)
Temperature setpoint; 210
Ϯ
10
Њ
C
(Sensing tip: K thermocouple)
Wetted materials: Ceramic, Viton, glass filter, SUS31
Conversion efficiency: 90% or higher, conforms to JIS
Gas Flow Rate: 0.5 L/min
Ambient Temperature: -5 to +45
Њ
C
Power Supply: 100 VAC , 50/60 Hz (K9350LE)
100 to 240 VAC , 50/60 Hz (K9350LF)
Power Consumption:
Approx. 85 VA
Safety conforming standards:
EN61010-1
Pollution degree 2
Installation category II
Weight:
Approx. 1.1 kg (K9350LE)
Approx. 1.2 kg (K9350LF)
Sample gas requirements:
Dust/drain removed, gas temperature at
150
Њ
C or less
T15.eps
Catalyst for NO
2
/NO converter
Glass wool for NO
2
/NO converter
Fitting for NO
2
/NO converter
Part No.
K9350LP
K9350LQ
K9350LV
Qty
2
2
2
One-year-Use Spare Parts
Item
External Dimensions
7 8
100V AC
(Shared with internal wiring)
Wiring Diagram
Gas Inlet
л
9.5/
л
5.5
4-
л
5
135
(120)
105
(210)
Approx.130
110
(150)
Gas Outlet
л
9.5/
л
5.5
Unit: mm
K9350LE
K9350LF