Microdin startup, Operations – Watlow MICRODIN User Manual
Page 82
6 . 2 Wa t l o w M i c r o D I N
Operations
MicroDIN Startup
Starting the Watlow MicroDIN for either one zone or several
in any thermal system requires successful completion of this checklist:
• Units securely mounted
• Proper sensor placement (see Watlow Application Guide)
• Correct input wiring
• Correct communications wiring
(see p. 2.2 - 2.4, 3.5, 3.8, 3.9)
• Correct fusing installed
• Correct limit protection installed
• Correct power wiring
• PC communication EIA-485 card, or PC communications card to EIA-485
• Communications port correctly initialized (see PC communications card
document)
• MicroDIN Address set and recorded
• MicroDIN-compatible software
• MicroDIN correct order of parameter configuration