beautypg.com

Teledyne 7600 - Infrared gas analyzer - operating manual User Manual

Page 34

background image

Installation Model

7600

Teledyne Analytical Instruments

34

2.7 Testing the System

After the analyzer has been installed with gas and electrical

connections but prior to powering up the unit make sure you have:

• Installed the unit correctly
• Checked the gas connections for leaks

Once the above checks have been made, you can connect the power

source and turn the analyzer on using the power switch on the front
panel. Allow the analyzer to warm up for four hours.

When the instrument is first turned on, you will see the

measurement screen. While in the warm up stage, the readings are
inaccurate. They may even be above the upper limit of range, however,
this is not an error.

After the analyzer has come to equilibrium (approximately four

hours after first powering up) the instrument is ready to be configured
and calibrated for your process. This is described in Section 3.