beautypg.com

Installation – Teledyne 7600 - Infrared gas analyzer - operating manual User Manual

Page 21

background image

Infrared Gas Analyzer

Installation

Teledyne

Analytical

Instruments

21

Installation

Installation of the analyzer includes:

1. Unpacking the system.
2. Choosing a suitable location
3. Mounting the analyzer
4. Mounting the terminal module
5. Installing gas connections
6. Making electrical connections
7. Testing the installation.

CAUTION:

READ THIS CHAPTER IN ITS ENTIRETY BEFORE
INSTALLING THE SYSTEM.

FOR INDOOR USE ONLY.

2.1 Unpacking the Analyzer

The Model 7600 Infrared Gas Analyzer is shipped with the

following components:

• 7600 Analyzer
• Input/Output terminal module set
• Connection cable
• Power cable
• Fuse (2)
• Cell window mounting tool
• Slide rail (2)*
• Relay board for auto calibration*
• Relay board connection cable*
• Instruction manual