CognitiveTPG CRx User Manual
Page 86

82
Chapter 11: Cleaning and Preventive Maintenance
5) Slightly spread the front of the enclosure, and begin sliding it forward on the base.
Ensure that the green ground wire shown at right is placed in the cavity of the
enclosure as shown.
6) Ensure that the enclosure on-off switch tab is above the on-off switch as shown. That
will help properly locate the enclosure on the base. Check the fit of the enclosure
to the base. The User Interface Cover should rotate freely. That indicates proper
location of the enclosure.
7) Install and torque the two screws shown at right. Torque to 2.5 in.-lbs.
This manual is related to the following products: