Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

85

Millennium Intelligent Controller Retrofit

This section provides a method for changing the standard J85501K-1 Millennium
Intelligent controller with the J85501-P1, Millennium II controller.

NOTE:

• This procedure will cause the office alarms to operate. Inform the

operating company before starting this procedure.

• Inform all personnel responsible for the power system that History

and Statistics will be lost, unless written to file before power down.

Safety

Action Verified

Always consider personal safety before beginning any procedure. Review the
Safety section.

Observe antistatic precautions during the procedure.

Mark and tag all cables associated with the change before starting work.

Use only insulated tools.

Make sure the system is properly grounded per the National Electrical Code
and local building codes.

Remove all metal jewelry.

Retrofit Materials

Material Verified

Wire cutters and strippers
18 to 22 AWG wire
Jewelers screwdriver (Flat and Phillips)
Small needle nose pliers
Pen for Marking/Tagging connections
Digital meter, +/- 0.02%
Screw Drivers (flat-blade and Phillips)
ESD wrist strap
Wire-wrap tool or Amp alarm punch-down tool (Alarm terminations)
Laptop PC (System backup)
6-32 nut driver

Preparing the Controller
Preparation of the controller consists of:

Placing the system in Float Mode

Turn all available rectifiers on

Backing up the existing configuration so that it may be loaded onto the new
controller