GE Industrial Solutions Millennium II Controller J85501P-1 User Manual
Page 100

Basic Installation and User’s Guide for the Millennium II Controller
Issue 3 January 2008
100
Config Auto Restart to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-6 Critical
=
Major
Relays
Using the front panel, go to:
MenuÆConfigÆSystem Settings
Config Crit=Major to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-5
Alarm Test
Using the front panel, go to:
MenuÆConfigÆAlarm Test
Config Test to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-4
HVSD during Alarm
Test
Using the front panel, go to:
MenuÆConfigÆAlarm Test
Config HV Shutdown to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-3
Boost Mode
Using the front panel, go to:
MenuÆConfigÆRect Boost
Config Enable to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-2 External
Timed
Boost
Using the front panel, go to:
MenuÆConfigÆRect Boost
Config Timed to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW202-1
Password Reset for
Indep Modem
Not Applicable for Millennium II
IntelligentController (BSJ) Dip Switch Settings
Millennium
Switch
Position
Description
Millennium II Setting
SW203-8 Remote
Rectifier
in
Standby
Set SW202-4 to:
0 if Millennium was 0
1 if Millennium was 1
SW203-7 Remote
Rectifier
Turn On
Using the front panel, go to:
MenuÆConfigÆPlant
Config Remote On to:
Enabled if Millennium was 1
Disabled if Millennium was 0
SW203-6 Full
Access
through
Local Port
Using the front panel, go to:
MenuÆConfigÆComm PortsÆLocal Port
Config Write to: