beautypg.com

Wiring alarm and control inputs – GE Industrial Solutions Millennium II Controller J85501P-1 User Manual

Page 32

background image

Basic Installation and User’s Guide for the Millennium II Controller

Issue 3 January 2008

32

Wiring Alarm and Control Inputs

In a standard Galaxy Power System configuration, plant level alarms are sent to the

controller via the Bay Interface Card through serial data communication. The following

alarm inputs are provided for discretionary use in non-standard applications.

Table 4-C: Controller Alarm and Control Inputs

Alarm Pin

Number

Signal Name

Low Voltage 2 Disconnect State Detect

61

LVD2

Fuse Alarm Major

63

FAJ

Fuse Alarm Minor

65

FAN

Auxiliary Alarm Major

64

AMJ

Auxiliary Alarm Minor

66 AMN

Timer Float Control

67

TFLT

Timer Boost Control

68

TBST

Plant Battery Test

71

PBT

Open String Detect

72

OS

Transfer Rectifier 1

73

TR1

General Purpose Input 4

74

IN-4 previously TEQ

General Purpose Input -5 (Previously

Engine Transfer)

75

IN-5 Previously ETR

Reserve Operation

77

RO

Transfer Rectifier 2

79

TR2

Transfer Rectifier 4

80

TR4

Reserve Battery-Emergency Power Off

81

RBRPO

General Purpose Input 1

82

IN-1

BTP or General Purpose Input 2

83

IN-2/BTP

Low Voltage 1 Disconnect State Detect

84

LVD1

Transfer Rectifier 3

85

TR3

General Purpose 4-20mA Measuring

Circuit

87 4-20mA

General Purpose 4-20mA Measuring

Circuit-RTN

88 4-20mAR

BTPFLT or Generic Input 3

89

IN-3/ BTPFLT

Low Voltage 3 Disconnect State Detect

Also

Battery Thermal Protect Major

90 LVD3/

BTMJ

General Purpose 0-5Vdc Measuring

Circuit

91 0-5V

General Purpose 0-5Vdc Measuring

Circuit-RTN

92 0-5VR