Receipt of goods and storage, Installation instructions – M&C TechGroup CSS Series Operator's manual User Manual
Page 27

27
Gas sampling and gas conditioning technology
4-1.1-ME
14
RECEIPT OF GOODS AND STORAGE
The CSS is completely pre-installed and normally delivered in one packaging unit.
Please take the gas conditioning system and possible special accessories carefully out of the pack-
aging material immediately after arrival, and compare the goods with the items listed on the delivery
note;
Check the goods for any damage caused during delivery and, if necessary, notify your transport
insurance company without delay of any damage discovered.
N O T E !
The CSS must be stored in a weather-protected frost-free area!
15
INSTALLATION INSTRUCTIONS
The compact construction of the CSS
means that it takes up little space and that the 19“ unit can be
excellently integrated within analysis systems.
N O T E !
The equipment is to be used in a vertical position only. The perfect
functioning of the seperation and drainage procedures will only be
guaranteed if the equipment is used in a vertical position.
The gas conditioning system should be installed in an area well away
from any heat emitting sources in order to prevent demage caused by
an accumulation of heat.
Pay attention to a non critical installation for individuals.
The compact gas conditioning system is preferably designed for
mounting in a cabinet. When the cabinet is installed outside, ample pro-
tection against the effects of direct sunlight and dampness must be
provided. In winter, the equipment must only be used in frost-free ar-
eas; pay attention to the protection class of the device.
In order to guarantee the operational safety of the gas conditioning sys-
tem and the additionally connected analysers, and to avoid false
alarms, the gas conditioning system should not be used at tempera-
tures other than those specified.
It is of great importance that the analysers which have been addition-
ally connected be used at temperatures well above the specified gas
outlet dew point of +5°C. This prevents the gas in the connector lines
from condensing completely.
In the event of the unheated sample gas lines being connected to the
gas conditioning system on a slope, it is not necessary to carry out a
preliminary condensate removal.