beautypg.com

Installing the tpm, Required tools, Starting the task – FUJITSU PRIMERGY RX900 S1 User Manual

Page 270: 4 installing the tpm, 1 required tools, 2 starting the task

background image

270

Maintenance Manual

RX900

S1

Baseboard

14.4

Installing the TPM

14.4.1 Required tools

Starting and completing the task:

key for the rack doors (if applicable)

Phillips Ph2 screw driver

Installing the TPM:

Phillips Ph0 screw driver

14.4.2 Starting the task

Ê

Perform the following procedures:

1.

"Opening the rack door" on page 40

2.

"Shutting down the server" on page 41

3.

"Sliding the server out of the rack" on page 42

4.

"Opening the server" on page 44

5. Remove the PCI Riser, see

"Expansion cards and BBU" on page 105

Authorized personnel

Authorized specialist personnel can carry out replacement tasks for
integral server components. Ask you local Fujitsu service center for
more detailed information.

V

CAUTION!

Procedures indicated as "Authorized personnel only“ must be
done by Fujitsu service personnel or technicians trained by
Fujitsu for doing these tasks. Please note that unauthorized
interference with the system will void the warranty and exempt the
manufacturer from all liability.