Completing the task, 8 completing the task – FUJITSU PRIMERGY RX900 S1 User Manual

Page 214

background image

214

Maintenance Manual

RX900

S1

Processors

Ê

Fasten the heat sink with its five captive screws. Fasten the screws
alternately until they are fully tightened:

Give each screw about 4 turns at a time.

Start with screw 1 to screw 5 as indicated in

figure 127

and continue with

screw 1.

Torque: 0.6 Nm

10.2.8 Completing the task

Ê

Perform the following procedures to complete the task:

1.

"Inserting the CPUMEMR in the slot" on page 186

2.

"Closing the server" on page 47

3.

"Mounting the server in the rack" on page 49

4.

"Bringing the server back to operation" on page 51

5. Enter the BIOS menu and enable the replaced processor.

6.

"Closing the rack door" on page 51