KACO blueplanet 750 - 1000 kVA User Manual
Page 81

KACO blueplanet 1000/875/750 TL3 M1 IS OD DEX0
Page 81
Parameters
Parameters
Min
Max
Unit
Descriptions
Grid Over Voltage
Level 2 Trip Time
40
2000
ms
Time for grid over voltage level 2 trip
Grid Under Voltage
Level 1 Trip Time
100
10000
ms
Time for grid under voltage level 1 trip
Grid Under Voltage
Level 2 Trip Time
40
3000
ms
Time for grid under voltage level 2 trip
Grid Under Fre-
quency Level 1 Trip
Time
100
20000
ms
Time for grid under frequency level 1 trip
Grid Under Fre-
quency Level 2 Trip
Time
40
3000
ms
Time for grid under frequency level 2 trip
Grid Over Frequency
Level 1 Trip Time
40
3000
ms
Time for grid over frequency level 1 trip
FRT Enable
0
1
-
FRT (Fault Ride Through) Function
0: Disable
1: Enable
Grid Over Voltage
FRT Enable
0
1
Over Voltage FRT Function
0: Disable
1: Enable
Power Reduction
Gradient Level
0
100
%/Hz
Gradient level for frequency dependant power
reduction
Power Reduction
Deactivation
Frequency
0
0.3
Hz
Frequency limit for frequency dependant power
reduction deactivation
Grid Over Frequency
Level 2
0
3
Hz
Upper limit for grid over frequency level 2
Grid Over Frequency
Level 2 Trip Time
40
2000
ms
Time for grid over frequency Level 2 trip
Reconnection
Condition Mode
0
3
-
Reconnection Condition Function
0: Disable
1: Checked before connected to grid
(Germany Medium Voltage Requirements)
2: Checked according to VDE-AR-N 4105
(Germany Low Voltage Requirements)
Reconnection
Condition Upper
Voltage
-1
130
%
This parameter represents the upper voltage in the
range of “Reconnection condition” as a percent-
age of the rated value.
The negative value represents that the relevant
condition is not checked when an inverter decides
“Reconnection condition”.
Table 12: Grid Parameters