Commissioning a system, Commissioning process, Rack, cable, and power on process – Grass Valley GV STRATUS Installation v.3.1 User Manual
Page 27: Rack-mount devices

Commissioning a system
Commissioning process
Use the following list to guide the overall task flow of commissioning your system. This
commissioning process assumes you received your system completely set up and configured from
Grass Valley.
1.
Rack, cable, and power on process
on page 27. All systems require this process.
2.
Test system setup and configuration process
on page 40. All systems require this process. Verify
that your cabling is correct, the system is operational as when pre-staged by Grass Valley, and
to complete procedures by logging in to all devices and applications as user
Administrator
with password
adminGV!
.
3.
Customer network, licenses, and roles process
on page 44. All systems require this process. Set
up the GV STRATUS Core server on the customer's network and assign GV STRATUS licenses
and roles to the customer's groups and users.
4.
on page 46. All systems require this process. Add the customer's GV
STRATUS client PCs to the system.
Rack, cable, and power on process
All systems require this process.
1.
on page 27. All systems require this process.
2.
on page 31. All systems require this process.
3.
on page 32. All system require this process. Cable the GV STRATUS
servers that are in your system design.
4.
on page 37. Only systems with proxy on a dedicated Proxy Storage
system require this process.
5.
Power on K2 and GV STRATUS system devices
on page 40. All systems require this process.
Rack-mount devices
All systems require this process.
Follow the instructions you received with the rack-mount hardware to install each component of
the system. One rack-unit spacing is recommended between components for ventilation. The
recommended arrangement of devices is as follows: