beautypg.com

9 – start-up for atlas mechanical series, Installation completion checklist, Start-up – Gasboy Atlas Fuel Systems Installation Manual User Manual

Page 75: Installation completion checklist -1 start-up -1

background image

MDE-4331M Atlas® Fuel Systems Installation Manual · September 2014

Page 9-1

Installation Completion Checklist

Start-up for Atlas Mechanical Series

9 – Start-up for Atlas Mechanical Series

Installation Completion Checklist

Review the information below to verify proper installation of the Atlas mechanical series
dispensing unit. If the installation does not meet the criteria listed, correct the problem before
the start-up is performed.

To complete the installation, proceed as follows:

1

The unit must be properly secured to the island.

2

All plumbing must be complete and tight. All liquid-carrying lines must be checked for leaks.

3

When DC pulsers are used in the pump for connecting to Gasboy FMSs, AC and DC wires
must not share any conduits, J-boxes, or troughs unless the conditions outlined in

“Pulser”

on

page 5-3

and

“Wiring”

on

page 7-4

are satisfied.

4

All conduit work must be complete. All J-box covers must be secured. Conduits must not be
sealed until the wiring is verified through proper operation.

5

The unit must be properly grounded.

6

Before testing begins, remove any water in the tank through a fill opening, using a suitable
pump. Do not use the Gasboy pump or remote dispenser and submersible pump to remove
water. Serious damage may occur.

7

A sufficient volume of fuel must be present in the tank to ensure that the liquid level is above
the bottom of the suction pipe (suction pumps) or is high enough to allow the submersible
pump to operate efficiently (remote dispensers).

Start-up

After successfully verifying the installation against the completion checklist, the unit is ready
for start-up.

To perform an orderly start-up of the Atlas mechanical series dispensing unit, proceed as
follows:

1

Turn on the circuit breaker(s) for various control lines to the unit.

2

Remove the nozzle for side 1 from its holder and turn on the pump handle. Ensure that the

non-computer register goes through its reset sequence, which consists of resetting the total
volume wheels to zero.

3

Dispense the fuel. If the unit contains a slow/fast flow valve, ensure that it opens. Check all
plumbing for leaks at this time.

4

Turn off the pump handle and open the nozzle. No fuel must be dispensed.