Gasboy Atlas Fuel Systems Installation Manual User Manual
Page 43

MDE-4331M Atlas® Fuel Systems Installation Manual · September 2014
Page 6-13
Anchoring Pump/Dispenser to Island
Installation
2
Loosely anchor the pump/dispenser to the island as per the foundation layout locations using
all the required anchoring points, according to the following:
• Use 1/2-inch anchor studs with large heavy duty washers (slot designed for that size).
• Use bolts or studs that are of grade 5 steel.
• Use hardware that is corrosion-protected or resistant.
Note: Do not use plastic or low strength bolts, or pallet bolts.
• Studs/bolts must be anchored securely to the island or pit box (see
• See the anchor or pit box manufacturer’s instructions for important information.
Figure 6-5: Anchors for Pump/Dispenser
Contractor-supplied
Fittings (for example,
Union).
Anchor Bolts
- 216S (18 pages)
- Atlas Fuel Systems Site Prep Manual (42 pages)
- Atlas Technician Programming Quick Ref (2 pages)
- ATC M05819K00X Kits (28 pages)
- Atlas Fuel Systems Owner Manual (80 pages)
- Gilbarco Global Pumping Unit Operation Manual (42 pages)
- 26 (7 pages)
- Atlas Valve Replacement Kits (10 pages)
- 9120K (8 pages)
- 9820K (6 pages)
- Atlas Single Std. Inlet Centering Kit (8 pages)
- 8800 Atlas (1 page)
- 9120K Series Service Manual (40 pages)
- 9800A Atlas (6 pages)
- 9800 Atlas (20 pages)
- 9800 Atlas (14 pages)
- M08400 (6 pages)
- 9100 Series (8 pages)
- 9820K Series Installation (62 pages)
- 9853K (8 pages)
- 9216KTW (36 pages)
- Recommended Spare Atlas (14 pages)
- DEF Atlas (28 pages)
- 9820K Series (12 pages)
- 9800Q (1 page)
- Q Series (3 pages)
- 8753E (2 pages)
- 9152AXTW2 (1 page)
- 8800E (2 pages)
- 8800E (1 page)
- 9820Q Series (1 page)
- Atlas Start-up (230 pages)
- 215A (1 page)
- 9800A (4 pages)
- 9820A (1 page)
- 2600A (3 pages)
- 2600A (12 pages)
- 2600A (2 pages)
- 9800Q Front Load Vapor (2 pages)
- 9800Q Vapor (2 pages)
- 216A (31 pages)
- 215A (2 pages)
- Lamp Kit (2 pages)
- 9120Q Pulser (1 page)