7 – Reference Information

This section contains reference information for the contractor. The contractor may or may not
be required by individual contract to perform all or any of the requirements outlined. However,
all installations must conform to the requirements in this section. The information in this
section can be found in detail in MDE-4333 Atlas Fuel Systems Site Preparation Manual.

Note: The information in this section is not to be used exclusively in lieu of MDE-4333 Atlas

Fuel Systems Site Preparation Manual, as not all information contained in that manual
is found here.

Reference Contents

Section and Information

Location in MDE-4331

Electrical Requirements

page 7-2

Emergency Power Cut-off Switch

Circuit Breakers

STP Control Relay Boxes for Dispensers

STP Isolation Relays for Electronic Dispensers

Conduit

page 7-3

Wiring

page 7-4

Retail Data Wire Lengths

Grounding

page 7-6

Sealing ‘Y’ Fittings

page 7-7

Plumbing Requirements

page 7-8

Pipe Installation

Pipe Size

Pumps (Standard Flow)

Pumps (High Flow, Super-Hi, Ultra-Hi)

Dispensers (Standard Flow)

Dispensers (High Flow, Super-Hi, and Ultra-Hi)

Check Valves

page 7-10

Shear Valves