Page 73: Caution

MDE-4331M Atlas® Fuel Systems Installation Manual · September 2014
Page 8-1
Installation Completion Checklist
Start-up and Test for Atlas Electronic Series
8 – Start-up and Test for Atlas Electronic Series
Installation Completion Checklist
Review the information below to verify proper installation of the Atlas electronic series
dispensing unit. If the installation does not meet the criteria listed, correct the problem before
the start-up is performed.
To complete the installation, proceed as follows:
1
To avoid damage to the CPU PC board, ensure that the reset is complete, fast flow,
submersible starter drive, and slow and fast satellite return wires are not shorted to the conduit
or chassis.
2
The unit must be properly secured to the island.
3
All plumbing must be complete and tight. All liquid-carrying lines must be checked for leaks.
4
When the DC pulser, RS-485, or LAN lines are used in the pump for connecting to Gasboy
FMSs, the AC and DC wires must not share any conduits, J-boxes, or troughs, except as noted
in the conduit and pulse output or RS-485 wiring and the MDE-5013 TopKAT PLUS
Installation Manual, communication requirements.
5
All conduit work must be complete. All J-box covers must be secured. Conduits must not be
sealed until the wiring is verified through proper operation.
6
The unit must be properly grounded.
7
Do not use the Gasboy pump or remote dispenser and submersible pump to
remove water. Serious damage may occur.
CAUTION
Before testing begins, remove any water in the tank through a fill opening, using a suitable
pump.
8
A sufficient volume of fuel must be present in the tank to ensure that the liquid level is above
the bottom of the suction pipe (suction pumps) or is high enough to allow the submersible
pump to operate efficiently (remote dispensers).
9
Precautions for heating and insulation must be taken for DEF units that are installed in
locations that may experience 15 °F (-9.4 °C) or lower. For wiring details, refer to FE-356
Field Wiring Diagram Atlas Retail, Commercial, E85, and DEF Dispensers with Electronic
and Mechanical Displays.