Completing installation, Go to, Caution – Gasboy ATC M05819K00X Kits User Manual
Page 27

MDE-4431C Gasboy ATC M05819K00X Kits Installation Manual · February 2013
Page 27
Installing the Commercial Atlas (9800K) ATC Kits
40
Ensure that the threads on the Thermowell, Adapter, and Probe Assembly are
properly coated with the SAF-T-LOK TPS Sealant and tightened properly to
prevent leaks.
CAUTION
Tighten both the adapter and probe using the proper size wrench.
41
Connect the other end (Connector) of the Probe to Probe Connector Assembly in the connector
labeled “1”.
42
Locate the other two plugs in the hydraulic coupling toward the left side of the unit (see
).
43
Repeat steps
through
on
to mount the second Probe Assembly.
44
Connect the Connector end of the second Probe to Probe Connector Assembly in the
connector labeled “2”.
45
to complete the installation procedure.
Completing Installation
1
Dress the cablings by placing them in existing cable ties. Ensure the cables do not create any
obstruction to operation, access, or servicing.
2
Test the ATCs to determine that they are functioning properly.
This will involve running transactions and using the totalizer display (for more information,
refer to
“Appendix: Totalizer Display Information”
on
).
3
After determining that the ATCs are functioning properly:
• using screws saved, remount the dial enclosure assemblies.
• remount the doors on both sides of the unit.
• secure doors with the keylocks.
4
Inform the manager/owner that the unit can be returned back to service.