Artesyn Centellis 2000 Shelf - DC Installation and Use (June 2014) User Manual
Page 81
System Installation
Centellis 2000 Shelf - DC Installation and Use (6806800G45F)
81
Startup Procedure
Depending on the system configuration, the actual powering up may take up to 3 minutes.
Make sure that the system has been placed in a location at room temperature for at least
24 hours before powering it up.
1. Put on an ESD wrist strap.
2. Connect the strap to the shelf by attaching the front or rear ESD jack/ESD snap.
3. Mount the grounding cable to the Protective Earth connection lug if not done
already.
4. Set the breakers on the PEM face plates to the OFF (tripped) position if they are not
already in this position.