beautypg.com

AMETEK MX CTSH User Manual

Page 48

background image

California Instruments

User Manual


3.7.4

Testing the PCI Card

MXCTSH must be installed first
must be rebooted. The new hardware
operating system. Follow the

Note:

When connecting the high
align the cable plug with
should insert easily. If undue force is needed, the
pins may be bent. Check the plug
the PACS-3-75 and the

NI E-Series DAQ Board

Once the PCI A/D card is installed
Automation” icon on the desktop.
now see the PCI card you installed

NI M-Series DAQ Board

Launch Measurement and Automation,

Select “Self-Test” and you should

Revision H

MX Series CTSH Compliance

first before performing a A/D card testing. After MXCTSH is

hardware should be detected automatically at boot

the on-screen prompts to finish installation of the A/D card.

high density 68 pin connector to the back of the A/D

with the A/D card connector carefully so as not to bent

If undue force is needed, the plug may not be aligned

be bent. Check the plug and connector carefully before installing

the PC.

installed and the PC has been re-booted, you should

desktop. Double click on it and expand the Devices and

installed as shown in the screen below.

Automation, select NI-DAQmx Devices, NI PCI-6250: “Dev1”.

should get the pop-up message below.

48

Compliance Test System

MXCTSH is installed, the PC

boot by the Windows™

to finish installation of the A/D card.

A/D card in the PC, make sure to

bent any pin. The connector

not be aligned properly or one or more

installing the supplied cable between

should see a “Measurement and

and Interfaces tree, you will

6250: “Dev1”.

This manual is related to the following products: