Form RZ-NA I-SCE, Page 30

FIGURE 30 -

Propane Gas

Burner Rack

Showing Burner Air

Shutter Adjustment

Screw

Burner Air

Shutter

Adjustment

Screw

†

Verify suspension/mounting methods and clearances. See Paragraphs 5 and 6.

†

Verify that the bolts removed from the shipping clips were returned to the heater cabinet.

See Paragraph 4.

†

Check duct connections. See Paragraph 8.

†

Check venting. See Paragraph 9. Be sure that flue discharge and combustion air openings

are free of obstructions.

†

Be sure electrical entrance and gas supply pipe openings are sealed.

†

Be sure that all condensate drains are open. See Paragraph 7.

Electrical Checks:

†

Be certain the electrical supply matches voltage rating of the furnace. (See rating plate.)

†

Check all field wiring against the wiring diagram. Be sure that wire gauges are as required

for the electrical load.

†

Check that fuses or circuit breakers are in place and sized correctly.

Gas Supply Checks:

†

Check piping for leaks and proper gas line pressure. Bleed gas lines of trapped air. See

Paragraph 10.

a) Turn manual shutoff valve to off position.

b) Turn gas supply on.

c) Observe gas meter for movement, or

d) Attach pressure gauge readable to .1" w.c. and after turning gas on for ten seconds,

turn gas supply off. No change in pressure should occur over a three-minute period.

e) If either c) or d) above indicate a leak, locate leak by brushing a soapy solution on

all fittings. Bubbles will appear at a leak. Repair and repeat tests.

Blower Checks:

†

Check blower pulley and motor pulley to be sure they are secure to the shafts. Check belt

tension and alignment. See Paragraph 17.

†

Check the rotation of the blower. See Paragraph 17.

†

Verify the removal of all shipping supports. See Paragraph 4.

†

Check damper linkage. See Paragraph 26.

25. Check

Installation

and Startup

Check the

installation prior to

startup

23. Burner

Orifices

(cont'd)

24. Burner Air

Shutters

Air shutters are required on propane units, optional on natural units. A slotted screw on the end

of the manifold bracket moves air shutters and adjusts all burners simultaneously (See FIGURE

30). Turning the screw clockwise opens the air shutter; counterclockwise closes shutter.

After the furnace has been in operation for 15 minutes, close air shutter until the flame turns

yellow. Open shutter until yellow disappears.

125

150

175

200

225

250

300

350

400

Burner Orifices

Qty

5

7

7

9

9

12

12

14

16

Drill Size

#42

#44

#42

#43

#42

#44

#42

#42

#42

P/N

84437

11833

84437

11828

84437

11833

84437

84437

84437

Drill Size

1.45 mm

#55

1.45 mm

#55

1.45 mm

#55

1.45 mm 1.45 mm 1.45 mm

P/N

61652

11830

61652

11830

61652

11830

61652

61652

61652

Carryover Orifice

Drill Size

#70

#65

#65

#65

#65

#59

#59

#56

#56

Propane Gas

P/N

9870

9680

9680

9680

9680

10370

10370

9791

9791

Model SCE Size

Natural Gas

Propane Gas

DANGER: Failure to

adjust air shutters

according to directions

could cause property

damage, personal

injury, and or death.

Startup

†

Close all panels tightly. Turn electric and gas supply on to the furnace. Adjust the thermo-

stat or ductstat so that a call for heat exists. Observe for complete sequencing of safety

pilot and ignition.