Parts in the Vertical Vent

Terminal/Combustion Air

Package (Option CC2)

Components

Required - Factory

and Field

VERTICAL VENT

INSTRUCTIONS

Field-supplied installation

requirements:

• Vent pipes - see requirements, page 8.

• Combustion air pipes - see requirements, page 8.

• Taper-type pipe diameter reducers and/or increasers as required.

• Thimble (a thimble is not required if wall is of non-combustible construction).

• Flashing.

• Sheetmetal screws, tape, and sealant as required.

Installation

Instructions

for Vertical Vent/

Combustion Air Kit

Option CC2

1. Determine the location of the vent terminal.

Select a location away from fresh air intakes, allowing space for the concentric adapter box inside.

Vent terminal must be located from adjacent buildings as shown in FIGURE 18, page 17.
If more than one vertical concentric vent/combustion air terminal (Option CC2) is being installed,

the minimum spacing between vent centerlines is determined by the minimum outdoor design

temperature (most extreme outdoor condition at the installation site).

Exhaust

(Vent)

Terminal,

P/N 53326

Combustion

Air Inlet,

P/N 53330

FIGURE 14 - Brackets

for Attaching the

Concentric Adapter Box

to the Roof

4. Prepare the Concentric Adapter Box

a) Attach the brackets to the box. Follow the instructions in FIGURE 14 .

Qty

P/N

Description

1

205896 Complete Vertical Vent Kit (Same as Option CC2)

1

205885 Concentric Adapter Box Assembly (See FIGURE 10 , page 10)

1

53326

Exhaust (Vent) Terminal (illustrated below)

1

53330

Combustion Air (illustrated below)

2

207232 Brackets for attaching Concentric Adapter Box (See FIGURE 14 , below.)

1

53335

Tube of High Temperature Silicone Sealant

WARNING: All vent

terminals must be

positioned or located

away from fresh air

intakes, doors and

windows to preclude

combustion products

from entering

occupied space.

Failure to comply

could result in severe

personal injury or

death and/or property

damage.

2. Install the Vent Pipe and Combustion Air Pipe Run -

Use the type of pipe specified (Require-

ment No. 1, page 8), and comply with the attachment requirements in Requirement No. 2 and No.

4, page 8. Length must comply with Requirement No. 3, page 8.
Seal all joints. Due to the high temperature, do not enclose the exhaust pipe or place pipe closer

than 6" (152 mm) to combustible material. Provide supports for the pipes. Extend the runs to close

to the roof at the location selected in Step 1 above.
3. Prepare a hole through the roof for the 8" (203mm) diameter combustion air pipe. A

thimble may or may not be required depending on building construction and/or local codes.

The larger diameter combustion air pipe serves as clearance for the vent pipe on non-combus-

tible construction.

°F

°C

inches

mm

31 or warmer

0 or warmer

36

914

-10 to 30

-23 to -1

60

1524

less than -10

less than -23

84

2134

Minimum Spacing between Centerlines of Vent Pipes in

Vertical Combustion Air/Vent Terminals (Option CC2)

Minimum Outdoor Design

Temperature