Horizontal or vertical – Reznor SCE Unit Installation Manual User Manual
Page 11
Form RZ-NA I-SCE, Mfg #207697 Rev 7,
Page 11
FIGURE 11 - Concentric
Adapter Box
Connections
• If using 6” diameter pipes ,
Model SCE always require a
6” to 5” (152 to 127 mm)
reducer in the vent pipe.
• If using 7” diameter pipes
(allowed on Sizes 200-400) ,
Model SCE always requires
a 7” to 5” (178 to 127 mm)
reducer in the vent pipe and
a 6” to 7” (152 to 178 mm)
enlarger for attaching the
combustion air pipe.
Horizontal, Option CC6,
instructions begin on page 12.
Vertical, Option CC2,
instructions begin on page 15.
Is the Separated
Combustion Vent/
Combustion Air
System Horizontal or
Vertical?
HORIZONTAL OR VERTICAL?
When pipe diameters differ, depending on direction of airflow, join the pipes with either a taper-
type reducer or enlarger. Refer to illustrations in FIGURE 11 for pipe connection requirements at
the concentric adapter box.
Do NOT make actual connections until after reading the instructions and length requirements for
installing the vent/combustion air kit. The connection requirements are the same for both verti-
cal and horizontal systems, but the length of the double-wall pipe will vary.
Pipe Connections at
the Concentric
Adapter Box
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)