EVCO EVF815P9 User Manual
Page 32
EVCO S.p.A.
EVF815 | Installer manual ver. 1.2 | Code 144F815E124
page 32 of 60
r5 1 500 min
90
maximum duration of temperature-controlled blast chilling;
see parameter r3 also
r6 1 500 min
240
maximum duration of temperature-controlled deep
freezing; see parameter r4 also
r7 -50.0 99.0 °C/°F
(1)
0.0
work set-point during blast chilling; also work set-point
during the soft deep freezing phase (cabinet temperature);
see also parameter r0
r8 -50.0 99.0 °C/°F
(1) -40.0
work set-point during deep freezing (cabinet temperature);
see also parameter r0
r9 -50.0 99.0 °C/°F
(1) -20.0
work set-point during hard blast chilling phase (cabinet
temperature); see also parameter r0
r10 -50.0 99.0 °C/°F
(1)
2.0
work set-point during post blast chilling storage (cabinet
temperature); see also parameter r0
r11 -50.0 99.0 °C/°F
(1) -20.0
work set-point during post deep freezing storage (cabinet
temperature); see also parameter r0
r12 -50.0 99.0 °C/°F
(1)
5.0
work set-point during pre-cooling (cabinet temperature);
see also parameter r0
r13 -50.0 99.0 °C/°F
(1)
15.0
end temperature of the temperature-controlled hard blast
chilling phase (temperature detected by the needle probe)
r14 10 100
%
60
duration of the time-controlled hard blast chilling phase
(intended as a percentage of the value established with
parameter r1); also duration of the time-controlled soft
deep freezing phase (intended as a percentage of the value
established with parameter r2)
r15 -50.0 99.0 °C/°F
(1)
65.0
temperature below which the count of the maximum
temperature-controlled blast chilling and maximum
temperature-controlled deep freezing is started
(temperature detected by the needle probe)
r16
0
2
- - - -
1
type of operating cycle that can be selected
0 = blast chilling and storage
1 = blast chilling and storage or deep freezing and
storage
2 = deep freezing and storage