3 aggregate control, 4 cement control, 5 mixer control – Rice Lake CB-2 Concrete Batch Controller Version 2.0 User Manual
Page 63: 6 plant control, 7 water control, 8 admixture control, Aggregate control, Cement control, Mixer control, Plant control

Installation/Operation Manual - Front Panel
59
•
Each control includes status lights
9.1.3
Aggregate Control
The CB-2 has an aggregate control panel which includes:
•
Eight single speed or four dual speed fills or up to eight single speed controls
•
Status light on each gate
•
Weigh hopper discharge gate control
•
Aggregate vibrator control
•
Sand bin vibrator control
9.1.4
Cement Control
The CB-2 has a cement control panel which includes:
•
A choice of four cements with dual speed fill or up to eight single speed controls
•
Status lights on each gate
•
Cement bin aeration on four bins
•
Weigh hopper discharge gate control
•
Weigh hopper vibrator control
•
Weigh hopper aeration control
9.1.5
Mixer Control
The CB-2 has a cement control panel which includes:
•
Fully integrated mixer controls
•
Mixer start control
•
Mixer stop control
•
Mixer discharge control
9.1.6
Plant Control
The CB-2 has a plant control panel which includes:
•
Manual override control
•
Status lights
9.1.7
Water Control
The CB-2 has a water control panel which includes:
•
Hot and cold controls with status lights
•
Metered water pulse status light
•
Reservoir discharge control and empty status light
•
Adjustable tail water discharge in either manual or automatic mode
9.1.8
Admixture Control
The CB-2 has a water control panel which includes:
•
Automated and manual control of admixtures
•
Pulse meters including eliminating outboard control
•
Up to six admixtures or colors
•
Fill/fee control and status lights
•
Discharge control and status lights
•
Bottle empty status lights