Rice Lake CB-2 Concrete Batch Controller Version 2.0 User Manual
Cb-2, Installation/operation manual
Table of contents
Document Outline
- About This Manual
- Safety
- 1.0 Introduction
- 2.0 Installation
- 2.1 Important Notes
- 2.1.1 Two Power Sources
- 2.1.2 I/O Power and Manual Panel Same Phase Power
- 2.1.3 Unused Inputs Must be Jumpered to 120V
- 2.2 CB-2 Main Junction Block
- 2.3 Load Cells
- 2.3.1 Serial Communications
- 2.4 Digital I/O
- 2.5 Battery Replacement
- 2.6 Replacement Parts
- 2.6.1 Option Cards
- 2.7 Installing an Optional PS-2 Keyboard
- 3.0 Configuration of Scale Parameters
- 4.0 Configuration of User Parameters
- 5.0 Calibration
- 6.0 Utilities
- 6.1 Material Usage
- 6.1.1 Usage Reports
- 6.1.2 Adjust Inventory
- 6.1.3 Clear Day Totals through Yearly Totals
- 6.2 Tune Plant
- 6.2.1 Min. Drop Screen
- 6.2.2 Tune Jogs Screen
- 6.3 Reports
- 6.3.1 Print Mix Designs
- 6.3.2 Print Application Parameters
- 6.3.3 Print Diagnostics
- 6.4 Diagnostics
- 6.4.1 Test Inputs
- 6.4.2 Test Outputs
- 6.4.3 Test Ticket Printer
- 6.4.4 Test Report Printer
- 6.4.5 Test Serial Ports
- 6.4.6 Print Diagnostics
- 6.4.7 Clear Diagnostics
- 7.0 EZ Change Criticals
- 8.0 Batching
- 9.0 Front Panel
- 10.0 Appendix
- 10.1 Configuration Parameters for the CB-2 Weighed Materials Discharged Using an Inch Gate
- 10.2 Configuration Parameters for CB-2 Weighed Materials Discharged Using an Open Close Gate
- 10.3 Weighing Material Preact Configuration Parameters
- 10.3.1 Preacts - Hopper Scale
- 10.3.2 Preacts - Decumulative Scale
- 10.3.3 EZ Change Criticals - Material Preacts
- 10.3.4 Preact Value Level When Used in Lose in Weight (LIW)
- 10.4 Entering a Mix Design
- 10.4.1 To Add a Mix Design
- 10.5 CB-2 Moisture Probe
- 10.6 Changing the Location of a Material
- 10.7 Dual Speed and Dual Concurrent Settings
- 10.8 Error Messages
- 10.9 CB-2 Loss In Weight Inching Gate
- 10.10 CB-2 Loss In Weight Open/Close
- 10.11 MNDot Conversion
- 10.12 Moisture Specifications
- 10.12.1 Cement/Water/Aggregate Mix Specifications
- 10.12.2 Oven Dry vs. Saturated Surface Dry Mix Designs
- 10.12.3 Example of Weight Adjustments Based on a Saturated Surface Dry Mix Design
- 10.12.4 Calculating Aggregate Moisture Content
- 10.12.5 Specifying Moisture Content and Absorption Factors
- 10.12.6 Calibrating a Moisture Probe
- 10.13 Reservoir Metered Water
- 10.14 Tuning Inching Gates
- 10.15 Setting up Time & Date Formats
- 10.16 CB-2 Administrative Codes
- 10.17 Adding Counter and Position Indicators