Rice Lake CB-2 Concrete Batch Controller Version 2.0 User Manual
Page 34

30
Installation/Operation Manual
Database Parameters
ADMIN Menu
Parameter
Choices
Description
Level 2 Sub-menu
DATABASES
Level 3 Sub-menu
Materials Select or enter the material ID You have the ability to Add, Copy, Change, Delete or Exit
Level 4 Sub-menu ADMIN MENU/APPLICATION PARAMETERS/DATABASES/MATERIALS
Material ID
ID used to reference this material
Name
Material name
Source
Material source
Material Type
Weighed
Metered
Select the method used to dispense this material.
Material Class
Aggregate
Cement
Primary Water
Admix
Auxiliary Water
Select one the five options for materials.
Under Tolerance %
2%
Enter the percentage under the target at which the material dispense is
considered under tolerance.
Over Tolerance %
2%
Enter the percentage over the target at which the material dispense is
considered over tolerance.
Daily Material Used
0.0
Daily dispensed accumulator
Weekly Material Used
0.00
Weekely dispensed accumulator
Monthly Material Used
0.00
Monthy dispensed accumulator
Yearly Material Used
0.00
Yearly dispensed accumulator
Material On Hand
0.00
Material on hand
Material Type = Weighed
Scale Settle Time
1.00
Minimum settle time
Slow Fill Weight
0
Weight to be dispensed at slow rate.
Minimum Drop Weight
500
Minimum dispense weight. Mixes calling for less than this aount will jog to the
target.
Preacts
Select to set up preacts.
Jogs
Select to set up jogs
Material Class = Aggregate
Absorbed moisture
0.0
Material absorption factor
Material Type = Metered
Conversion Factor
1
Volume units per pulse
Blow out time
0.0
Blowout time in seconds for bottled material.
Coast pulses
1
Pulse counting setpoint number
Coast time
5
Maximum coast time in seconds
Discharge delay
0.00
Delay time in seconds after the selected discharge point before discharge is
actually started.
Input is ON when empty
No
Yes
Emply signal polarity for bottled/reservoired materials.
Material Class = Admix