beautypg.com

40 door install – Oldcastle BuildingEnvelope Reliance-IG SS User Manual

Page 43

background image

40








R E L I A N C E - I G S S I N S T A L L A T I O N M A N U A L

D.2.5 Drill #11, .191 diameter holes in D-186 subframe for FS-15 rivets. Install door stops onto subframe

with SC-1 clips at 18" O.C. Locate clips around the subframe anchor screws. SEE FIGURE 47.

Vertical stops run through.

D.2.6 Install door per DOOR AND FRAME INSTALLATION AND GLAZING MANUAL.

D.2.4 Bed threshold in sealant, attaching to TH-44 clips with FS-42, #12 x 1/2" Phillips Flat Head screws.

Marry threshold seal with subframe and main system seal. SEE FIGURE 47.

2-13/16"

DS-1 Door Stop

Drill #11 (.191 dia.) hole

in subframe @ 18" o.c.

for FS-15 rivet

FS-325 (#12-14 x 1-1/2"

HH Drill-Flex) stagger around

subframe anchor

Perimeter seal at sill

Seal around base of D-186 &

vertical; Marry this seal with

threshold & perimeter seal

Bed threshold

in sealant

FIGURE 47

Door Stop and

Threshold Installation

DOOR INSTALLATION