beautypg.com

30 ssg installation – Oldcastle BuildingEnvelope Reliance-IG SS User Manual

Page 33

background image

30








R E L I A N C E - I G S S I N S T A L L A T I O N M A N U A L

FIGURE 33

Head Bridge Installation

FIGURE 34

Sill Bridge Installation

Crititcal to seal between edges of

horizontal face and bridge. Tool

sealant at interior and exterior

surfaces.

FS-114

#8 X 3/8" FHSMS

FS-114

#8 X 3/8" FHSMS

Critical seal between edges of horizontal

face and bridge. Tool sealant at interior

and exterior surfaces.

NOTE: Cap seal all fasteners after

installation of bridges.

Apply sealant to top of sill bridge.Apply

additional selant along edges of mullion

cap and sill once bridge is installed and

tool sealant to insure proper seal along

all surfaces.

Apply sealant to mullion and along edge as

shown. Seal across face of mullion making

sure to inject sealant into glazing reglets

and clip pocket. Apply additional sealant along

edges of mullion cap and generous bead of

sealant along each end of mull cap.

IW-300-01

Head Bridge

IW-302-01

Sill Bridge

SSG BRIDGE INSTALLATION