31 ssg installation – Oldcastle BuildingEnvelope Reliance-IG SS User Manual
Page 34
31
R E L I A N C E - I G S S I N S T A L L A T I O N M A N U A L
FIGURE 35
Interior Glazed Horizontal
Bridge Installation
at SSG mullion
Seal bridge to mullion
and horizontal
Seal between edges of
horizontal face and bridge.
Tool sealant at interior and
exterior surfaces.
Cap seal
fasteners
Apply sealant to top of horizontal and
along edge as shown. Seal across face
of mullion making sure to inject sealant
into glazing reglets and clip pocket. Sealing
of these reglets and pocket is critical.
FS-114
#8 X 3/8" FHSMS
IW-301-01
Horizontal Bridge
SSG BRIDGE INSTALLATION