R E L I A N C E - I G S S I N S T A L L A T I O N M A N U A L

PRODUCT USE

The Reliance -IG SS curtain wall system is intended for installation by glazing professionals with

appropriate experience. Subcontractors without experience should employ a qualified person to provide field

instruction and project management.

Oldcastle BuildingEnvelope does not control the application or selection of its product configurations,

sealant or glazing material and assumes no responsibility thereof. It is the responsibility of the owner,

architect and installer to make these selections in strict compliance with applicable laws and building codes.

Consult sealant manufacturer for review and recommendation of sealant application. Follow sealant

manufacturer's recommendations and literature for proper installation.

The air and water performance of the Reliance -IG SS curtain wall system is directly related to the

completeness and integrity of the installation process of both the seal installed at the horizontal to vertical

connections and the glazing gasket installed at the interior side of the glass. All pressure plates must also be

installed properly. To insure top performance for this system, particular attention should be given to the

following procedures:

1. Surfaces to be sealed should be cleaned with isopropyl alcohol or solvent and dried as

recommended by sealant manufacturer to remove dirt and cutting oils. Sealant at horizontal to

vertical connections should be a minimum 3/16" diameter bead on surfaces where horizontal

abutts vertical per glazing instructions herein. No gaps should be visible in the sealant. Exposed

surfaces should be cleaned after installing the horizontal. Inspect joint for complete sealant

contact, especially where the horizontal meets the face of the vertical member. Repair joint as

required.

2. The interior glazing gasket should be installed so as to avoid stretching, buckles or tears.

Corners must be cut square, sealed and butted together. To avoid damage to gasket and corner

joints during glazing, glass should be level and straight during installation.

Vertical movement of mullion at intermediate floors requires special expansion joints and glazing materials.

See page 35 - 36 for details which permit 1/4" movement. For designs and applications that may require greater

movement or special considerations please contact your local Oldcastle BuildingEnvelope facility.

Variations on the details shown are inevitable and are not the responsibility of Oldcastle BuildingEnvelope

when drawn by others. Oldcastle BuildingEnvelope strongly encourages its customers to use its

Engineering department for calculations and shop drawings.

For Structural Silicone Glazing applications, the stress on the silicone should not exceed 20 PSI. Consult

sealant manufacturer for specific applications to ensure proper loading on silicone joint. Alternate spacer

gaskets are available to accommodate larger sealant contact widths. Consult your nearest Oldcastle

BuildingEnvelope facility for assistance.

Consult glass manufacturer for correct setting block location and length for glass sizes in excess of 40 sq.ft.

PROTECTION AND STORAGE

Handle all material carefully. Do not drop from the truck. Stack with adequate separation so the material will

not rub together. Store material off the ground, protecting against the elements and other construction

hazards by using a well ventilated covering. Remove material from package if wet or located in a damp area.

For further guidelines consult AAMA publication "Care and Handling of Architectural Aluminum From Shop to

Site."