Kontron CG2200 Carrier Grade Server User Manual
Page 67

60
Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide
1. Power down the server and remove all peripheral devices and the power cord(s)
2. Remove the chassis cover. For instructions, see “Removing the Chassis Cover” in Section 3.2.
3. Loosen the blue captive retention screws all across the cross bar and where they are securing
components in the rear part of the chassis, remove these components from the chassis, also. (Figure
45, “A”)
For more information about removing the riser card assemblies, see “Removing a Riser Card
Assembly” in section 3.2.
For more information about removing the processor air duct, see “Removing the Processor Air Duct” in
section 3.2.
For more information about removing the hardware RAID controller SuperCap battery assembly, see
Section 4.4, “Installing the SuperCap Module”.