12 installing the server into a rack – Kontron CG2200 Carrier Grade Server User Manual
Page 64

57
Kontron CG2200 Carrier Grade Server Installation and Maintenance Guide
Figure 43. Installing a SATA DOM on the Server Board
4.12 Installing the Server into a Rack
Several different rack mounting kits are available, depending on whether you need 2-post or 4-post
mounting and whether you need 19-inch or 23-inch rack widths. Also available are a basic slide rail kit
and a rail enabling kit. For detailed information about the rack mounting kits and how to order them, see
the CG2200 Carrier Grade Server Configuration Guide. The latest version of the Configuration Guide is
located on the Kontron support website at
http://us.kontron.com/support/
(search for CG2200, click
on Product Downloads, then Ordering Guide).
Installation instructions are included in each of the rack mounting kits.
4.12.1 Connecting the Power Cord
NOTE: When using a rack, wait to install the power cord(s) until after the server is in the rack.
4.12.2 Equipment Rack Precautions
CAUTION: ANCHOR THE EQUIPMENT RACK — The equipment rack must be anchored to an unmovable
support to prevent it from falling over when one or more servers are extended in front of it on slide
assemblies. The equipment rack must be installed according to the manufacturer’s instructions. You
must also consider the weight of any other device installed in the rack.