beautypg.com

Installation pak 200 – Tweco Pak 200 User Manual

Page 39

background image

Manual 0-5057

3-13

INSTALLATION

INSTALLATION

PAK 200

Coolant Supply
Connection (Tagged Green)

Coolant Return
Connection (Tagged Red)

Art # A-04832

Plasma Gas
Connection

Shield Gas
Connection

Torch Leads

Figure 3-13: Set Switches 4

4. Re-install the module top cover.

Art # A-08383

Figure 3-14: Set Switches 5